What a house extension costs in Cumbria

Quick answer

A single-storey extension costs £1,800 to £3,000 per square metre to build, around £2,400, before VAT (Checkatrade, June 2026). On Checkatrade's size table a 20m² extension averages £48,000, a 30m² one £72,000 and a 50m² one £120,000, all excluding VAT (May 2024). A two-storey extension of about 60m² averages £144,000. Those are build figures. Drawings, surveys, building control and the kitchen go on top. In Cumbria the planning side moves the price more than the building does, because most of the county counts as article 2(3) land where side extensions and two-storey rear extensions always need an application.

Last checked 21 November 2026. Sources: Checkatrade: house extension cost, Planning Portal: extensions, planning permission, GOV.UK: Permitted development rights for householders, technical guidance, Lake District National Park Authority: planning permission, Cumberland Council: planning and building control, Westmorland and Furness Council: planning and building control, Planning Portal: Community Infrastructure Levy.

How much does a house extension cost?

Checkatrade puts a single-storey extension at £30,000 to £140,000 and a two-storey at £108,000 to £180,000, excluding VAT. The useful number is the rate per square metre, because it travels better between jobs: £1,800 to £3,000 per m², averaging £2,400 (June 2026). Multiply that by your floor area and you have a starting figure to test quotes against.

JobTypical cost excluding VATSource
Extension, per square metre£1,800 to £3,000, average £2,400Checkatrade, June 2026
Shell only, per square metre£1,200 to £1,700, average £1,450Checkatrade, June 2026
Small extension, 20m²£40,000 to £56,000, average £48,000Checkatrade, May 2024
Medium extension, 30m²£60,000 to £84,000, average £72,000Checkatrade, May 2024
Large extension, 50m²£100,000 to £140,000, average £120,000Checkatrade, May 2024
Premium extension, 30m²£75,000 to £110,000, average £92,500Checkatrade, May 2024
Two-storey extension, 60m²£108,000 to £180,000, average £144,000Checkatrade, June 2026
First floor over a garage, 25m²£45,000 to £75,000, average £60,000Checkatrade, June 2026

The size rows carry an older date than the per-square-metre rows, so treat them as a shape rather than a current price. Every figure excludes VAT, so ask each builder whether their quote includes it before you compare one against another.

How much would a 25m2 extension cost?

At Checkatrade's £1,800 to £3,000 per m², a 25m² extension works out at £45,000 to £75,000 for the build, with the middle of the range near £60,000, excluding VAT. A shell only, meaning foundations, walls and a watertight roof with nothing inside, would be £30,000 to £42,500 on the same figures.

25m² is roughly 5m by 5m, which is a decent kitchen diner on the back of a house. The spread between those two numbers is mostly glazing, roof type and ground conditions, not the builder's margin.

How much does a 3m by 4m extension cost?

3m by 4m is 12m². On Checkatrade's rate that is £21,600 to £36,000 to build, excluding VAT. It is the size a lot of people land on, because a single-storey rear extension of up to 3m is within permitted development for a semi or a terrace outside designated land, and 4m for a detached house.

The cost per metre usually climbs on a small job. Getting plant on site, the foundations, the roof and the drain connections cost much the same whatever the floor area, so small extensions tend to land at the top of the per-square-metre range.

How much does a typical 2 storey extension cost?

Checkatrade puts a 60m² two-storey extension at £108,000 to £180,000, averaging £144,000, excluding VAT (June 2026). That is about £2,400 per m², the same rate as a single storey. Going up adds floor area without adding much foundation or roof, so the second storey is usually the better value half of the job.

A first floor built over an existing garage is the cheaper version. Checkatrade puts 25m² of that at £45,000 to £75,000, averaging £60,000, though it depends entirely on whether the existing foundations will take it. That is a structural engineer's call, not a builder's.

Is 30k enough for an extension?

For a build only, £30,000 at Checkatrade's rates buys roughly 10m² to 16m² of finished extension, or a shell of about 20m², excluding VAT. That is a porch, a utility, a downstairs shower room or a small single-storey infill rather than a kitchen diner.

It stretches further if you take on the finishing yourself. A shell only extension gives you foundations, walls and a roof at £1,200 to £1,700 per m², leaving the plastering, decorating, flooring and second fix to you or to separate trades. Plenty of people in Cumbria do it that way. Be honest with yourself about how long you will live with bare blockwork before you commit to it.

What is the most expensive part of a house extension?

Groundworks and the structure. Foundations, drainage diversions and the structural openings into the existing house swallow the money before anything looks like a room, and they are the part most likely to go over, because nobody knows what is under the garden until it is dug.

After that it is glazing and the fit-out. Bifolds, roof lanterns and a kitchen are where a standard spec turns into a premium one: Checkatrade's premium 30m² figure of £92,500 is about 28 per cent above its standard 30m² figure of £72,000, and most of that gap is what goes inside rather than what holds it up.

Ask every builder to price the shell and the fit-out as separate lines. It makes quotes comparable, and it shows you where to trim if the total comes back too high.

What are the steps involved in building an extension?

Design, permission, building regulations, then build. In practice it runs like this.

Expect the paperwork to take longer than people tell you. A householder planning application alone gives the authority eight weeks to decide, before a brick is laid.

What is the 50% rule for house extension?

Only half the area of land around the original house can be covered by extensions or other buildings, according to the Planning Portal. Go past that and permitted development stops applying, whatever the size of the extension itself.

"Original house" means the house as first built, or as it stood on 1 July 1948 if it is older, so a previous owner's extension counts against your allowance. "Other buildings" covers sheds, garages and outbuildings as well as extensions. On a long thin Cumbrian garden with a stone outbuilding already on it, the 50 per cent test bites sooner than people expect.

The full set of permitted development limits, and what changes inside the National Park, is in the Lake District planning permission guide.

What's different in Cumbria

The planning authority depends on where the house is. Inside the Lake District National Park it is the National Park Authority at Murley Moss in Kendal. The Yorkshire Dales National Park Authority covers the Dales end of the county around Sedbergh and Dent. Everywhere else is Cumberland Council, covering Carlisle, Workington, Whitehaven, Cockermouth, Maryport and Wigton, or Westmorland and Furness Council, covering Kendal, Penrith, Barrow, Ulverston, Appleby, Windermere and Grange-over-Sands. Building control stays with the council either way, even inside the Park.

Both National Parks are article 2(3) designated land, and so is any conservation area, which takes in a good many Cumbrian town and village centres. On that land the Planning Portal's rules change in ways that cost money. Every side extension needs planning permission. Every rear extension of more than one storey needs planning permission. Cladding the outside is out. And the larger home extension scheme, the prior approval route that lets a detached house go to 8 metres and others to 6, does not apply at all, so a single-storey rear extension is capped at 4 metres detached and 3 metres for anything else.

Budget for that from the start. An application you did not expect means drawings, a fee and eight weeks before you can start, and the Park's householder checklist can also ask for a bat survey, a heritage statement, a tree survey, a flood risk assessment or non-mains drainage information. Those surveys are priced per job and sit outside the builder's quote.

Materials must be of similar appearance to the existing house under permitted development, which on a stone house means matching stone and slate rather than render and concrete tile, and reclaimed Cumbrian slate is not cheap. And if the work adds over 100 square metres of floor space it may be liable for a Community Infrastructure Levy charge, so check with the authority before you design something that crosses that line.

Find a builder near you

Builders listed in the directory, by town. Get three quotes on the same drawings and the same specification, and ask each one whether the price includes VAT. See all builders in Cumbria.

Frequently asked questions

Does an extension add value to a house?

Checkatrade says a house extension may add 10 to 20 per cent onto a home's value. That is a national figure and it is not a promise. On a modest house in a town where the ceiling price is low, it is possible to spend more on the extension than the house will ever get back, so check what finished houses of the size you are aiming at actually sell for in your own town first.

Do I need building regulations approval as well as planning permission?

Usually yes, and they are separate things. Planning permission is about whether the building may go there and what it looks like. Building regulations are about whether it is structurally sound, insulated, drained and safe. Westmorland and Furness Council puts it plainly: nearly all building work needs building control approval. Permitted development removes the planning application, not the building control one.

Do builders charge VAT on an extension?

A VAT-registered builder charges VAT on the work. Checkatrade's figures all exclude it, which is why a quote can look higher than the cost guides. There are reliefs for some jobs, for example homes that have stood empty a long time or adaptations for a disabled person, so ask your builder and your accountant rather than assuming. The important thing when comparing quotes is that each one states clearly whether VAT is in or out.

How long is planning permission valid for?

Three years from the date it is granted, in England, unless the decision notice says otherwise. The work has to start within that period, not finish. The detail, including what counts as making a start, is in the Lake District planning permission guide.

Should I pay a builder up front?

Not the whole job, and not a large deposit before anything arrives on site. The normal arrangement is stage payments tied to work completed, for example at damp proof course level, at roof watertight, at first fix and at completion, with a retention held back for a short period afterwards. Put the stages in writing before work starts, and never pay for a stage that has not been reached.

How many quotes should I get for an extension?

Three, all working from the same drawings and the same written specification. Quotes built on different assumptions are not comparable, and the cheapest one is usually the one that has left something out. Check how to check a tradesperson in Cumbria before you hand over a deposit.

This guide is a plain-English summary for homeowners, not legal or technical advice. Rules and prices change, so check the linked sources and ask a registered tradesperson about your own property.