Planning permission in the Lake District National Park

Quick answer

Inside the Lake District National Park the planning authority is the National Park Authority, not Cumberland or Westmorland and Furness Council. Permitted development still applies, but the whole Park counts as article 2(3) land, so a single-storey rear extension is capped at 4 metres for a detached house and 3 metres for any other, side extensions, two-storey rear extensions, loft extensions and exterior cladding all need an application, and the larger home extension scheme doesn't apply. A householder application costs £548 in England (Planning Portal, November 2026) and the Authority has eight weeks to decide. Search applications on the LDNPA planning application search.

Last checked 6 November 2026. Sources: GOV.UK: Permitted development rights for householders: technical guidance, Planning Portal: extensions, planning permission, Planning Portal: how much does a planning application cost?, Planning Portal: what is the 10-year rule for planning enforcement?, GOV.UK: Planning permission, when you need it, Town and Country Planning (Development Management Procedure) (England) Order 2015, article 34, Town and Country Planning Act 1990, section 91, Town and Country Planning Act 1990, section 171B, Town and Country Planning (General Permitted Development etc.) (England) (Amendment) Order 2026 (SI 2026/313), Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026 (SI 2026/896), Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026 (SI 2026/1056), Historic England: Listed Building Consent, Lake District National Park Authority: planning permission, Lake District National Park Authority: planning advice, Lake District National Park Authority: applying for planning permission, Lake District National Park Authority: fees for planning applications, Lake District National Park Authority: Article 4 Directions, Lake District National Park Authority: conservation, Lake District National Park Authority: current Local Plan 2020 to 2035, Lake District National Park Authority: new Local Plan, Lake District National Park Authority: planning permissions with occupancy restrictions, Lake District National Park Authority: planning enforcement, Yorkshire Dales National Park Authority: planning, Checkatrade: architect cost, Checkatrade: planning permission cost.

Does permitted development apply in a National Park?

Yes, with extra limits. The General Permitted Development Order treats National Parks, the Broads, National Landscapes, conservation areas and World Heritage Sites as article 2(3) land, and the government's technical guidance strips out several householder rights there. The Lake District is both a National Park and a World Heritage Site, so every house inside the boundary is affected.

On article 2(3) land, the guidance says the following are not permitted development and need an application: cladding any part of the outside with stone, artificial stone, pebble dash, render, timber, plastic or tiles; any extension beyond a side wall; any rear extension of more than one storey; roof extensions such as dormers and loft conversions that change the roof; and sheds, garages or outbuildings on the land between a side wall and the boundary. Single-storey rear extensions are allowed but capped at 4 metres beyond the rear wall for a detached house and 3 metres for any other, and the larger home extension scheme that lets other homeowners go to 8 or 6 metres with prior approval does not apply.

The Authority's own advice is to check its planning permission page first and to use the government's mini-guides. If you want a formal answer, apply for a Certificate of Lawfulness for a proposed development. A fee is payable.

What is the maximum size extension without planning permission?

Inside the Park, a single-storey rear extension of up to 4 metres beyond the original rear wall on a detached house, or 3 metres on a semi or a terrace, no higher than 4 metres. Outside the Park, the same limits apply unless you use the larger home extension scheme, which allows 8 metres or 6 metres after a neighbour consultation and prior approval from the council.

Other limits apply everywhere. Planning Portal's summary of the rules says an extension cannot be higher than the highest part of the existing roof or higher at the eaves than the existing eaves, that where it comes within two metres of a boundary the eaves cannot exceed three metres, and that materials must look similar to the existing house. Extensions of more than one storey must not go more than three metres beyond the rear wall or within seven metres of the rear boundary, but in the Park a two-storey rear extension needs an application anyway. The total area of outbuildings and extensions must not cover more than half the land around the original house.

Permitted development rights can be removed by a planning condition on a previous permission or by an Article 4 direction, and they do not apply to flats or to houses created by a change of use. Building Regulations approval is separate and is needed for almost any extension.

What extensions don't require planning permission?

In the Lake District, a modest single-storey rear extension in matching materials, within the 4 or 3 metre limit and 4 metres high, is usually permitted development. So is a porch, a like-for-like window replacement, and a shed or garage that sits behind the house rather than beside it, within the height limits for outbuildings. In a National Park, buildings more than 20 metres from the house can't cover more than 10 square metres in total. Solar panels on a house roof are permitted development under Part 14 of the Order, subject to its conditions.

Most other projects that are permitted development elsewhere in England need an application here: a side extension, a wraparound, a two-storey rear extension, a dormer, a loft conversion that changes the roofline, external render or timber cladding, and an outbuilding beside the house. Changes to a listed building need listed building consent if they affect its character, whatever their size.

Before you commit to drawings, ring the Authority's duty planner. The service runs by phone each weekday between 0930 and 1200 on 01539 724555, first come first served, for short queries. For bigger or more complex schemes the Authority sells written advice.

What happens if an extension doesn't have planning permission?

GOV.UK says that if your project needs planning permission and you do the work without getting it, you can be served an enforcement notice ordering you to undo all the changes you have made. It is illegal to ignore an enforcement notice, though you can appeal. The Authority investigates reports through its enforcement concern form and publishes a map of every enforcement notice since 1974.

The time limit is now ten years. Section 171B of the Town and Country Planning Act 1990 says that in England no enforcement action can be taken more than ten years after building work was substantially completed, or ten years after a change of use. Planning Portal explains that breaches before 25 April 2024 keep the old four-year limit for building work and for a change of use to a single dwelling. There is no time limit at all for relevant demolition, such as pulling down a building in a conservation area without consent.

If you have built without permission, a retrospective application is usually the way to regularise it.

What is required for listed building consent?

Historic England says that if you want to alter or extend a listed building in a way that affects its character or appearance as a building of special architectural or historic interest, or even demolish it, you must first apply for listed building consent from your local planning authority. There is no fee. Carrying out unauthorised works to a listed building is a criminal offence and individuals can be prosecuted.

There are more than 1,800 listed buildings in the Lake District National Park, and the Authority says works affecting the historic character of listed buildings, and of certain structures around and near them, are subject to special controls. Consent is about the whole building, inside and out, so a new kitchen, a replaced window or a repointed wall can all need it. The Authority's validation checklist shows what to send with an application: a form, a site location plan, existing and proposed plans, and sometimes a heritage statement, a bat survey or a design and access statement.

Use a builder or joiner who has worked on listed buildings before. Ask the conservation team what materials it expects before you order anything.

How much does planning permission cost?

The application fee for a householder application in England is £548 (Planning Portal, read 6 November 2026). Planning Portal adds a service charge on applications submitted through it: £0, £99 or £149 depending on the type. Listed building consent has no fee. Drawings are the bigger cost.

ItemTypical costSource
Householder planning application, England£548Planning Portal, November 2026
Full application for a new house, England£610 per houseCheckatrade, March 2026; LDNPA fee schedule
Planning Portal service charge£0, £99 or £149 by application typePlanning Portal, November 2026
Listed building consentno feeHistoric England
LDNPA written pre-application advice£1,000; follow-on advice £350; Timeline service £3,120; affordable housing advice freeLake District National Park Authority, November 2026
Architect's drawings for a single-storey extension application£1,000 to £2,500Checkatrade, September 2024
Architect, hourly£50 to £100Checkatrade, September 2024
Structural engineer, hourly£50 to £90Checkatrade, September 2024

The Lake District Authority may ask for extra reports with an application, such as a bat survey, a heritage statement, a tree survey, a flood risk assessment or non-mains drainage information. Each is a separate professional fee, so ask the duty planner what you will need before you pay for drawings.

What's different in Cumbria

Cumbria has four planning authorities for householders. Inside the Lake District National Park it is the National Park Authority at Murley Moss, Kendal, which says it is the local planning authority, prepares the Local Plan, decides planning and tree applications and enforces planning control. The Yorkshire Dales National Park Authority covers the Dales part of the county around Sedbergh and Dent. Everywhere else is Cumberland Council or Westmorland and Furness Council.

Inside the Park the controls stack up. The whole Park is article 2(3) land, so the householder limits above apply in every village. Conservation areas add further control: the Authority publishes an A to Z list of them and defines them as areas of special architectural or historic interest, the character or appearance of which it is desirable to preserve or enhance. And the Authority has made Article 4 directions on specific sites, from Crosthwaite in Keswick to Storrs Park in Windermere, which withdraw permitted development rights there. It publishes the full list.

The Local Plan 2020 to 2035 is the development plan, with Policy 15 on housing and Policy 18 on sustainable tourism and holiday accommodation. Some permissions carry occupancy conditions that stop holiday use or require local occupancy, and the Authority maps them. A new Local Plan is being prepared, with a call for sites open until 26 March 2027. The Yorkshire Dales authority adopted its Local Plan 2025 to 2040 and a Design Guide in June 2026.

Expect to be asked about bats, trees, drainage and heritage. The Authority's householder checklist lists a bat survey, a heritage statement, a tree survey, a flood risk assessment and non-mains drainage information among the documents it sometimes needs, so budget for the surveys as well as the drawings.

Find a builder near you

Builders listed in the directory in the Lake District towns, and the gateways to the Park. Ask whether they have built inside the National Park before and who drew the plans. See all builders in Cumbria.

Frequently asked questions

How close can an extension be to a boundary?

There's no minimum gap for a single-storey extension, but Planning Portal's summary says that where it comes within two metres of a boundary the eaves cannot exceed three metres. An extension of more than one storey must not be within seven metres of the boundary opposite the rear wall. Outbuildings within two metres of a boundary are limited to 2.5 metres high. Party wall rules are separate from planning.

What falls under permitted development rights?

For householders, the government's technical guidance covers Classes A to H of the Order: extensions and alterations, additions to the roof, other roof alterations, porches, buildings and enclosures in the garden, hard surfaces, chimneys and flues, and microwave antennas. Each class has limits and conditions, and several are cut back on article 2(3) land such as the Lake District.

Are there any changes to permitted development rights in 2026?

Yes. Amendment orders made in England in 2026 include these three. SI 2026/313 added a right for reverse vending machines at shops from 9 April 2026. SI 2026/896 rewrote the rules for solar equipment on homes and flats, added plug-in solar to the definitions, and introduced prior approval for stand-alone solar on article 2(3) land within 5 metres of the boundary. SI 2026/1056 widened the rights for electric vehicle charging points and cross-pavement charging. Check legislation.gov.uk for the in-force dates.

What can you do to a grade 2 listed building without consent?

Anything that doesn't affect its character or appearance as a building of special architectural or historic interest. Historic England's test is whether the work alters or extends the building in a way that affects that character, and the grade makes no difference to the need for consent. Because the line is hard to judge, ask the Lake District Authority's conservation team before you start. Unauthorised works are a criminal offence.

How much does a listed building consent cost?

Nothing. Historic England says there is no fee for a listed building consent application. You still pay for the drawings and, often, a heritage statement.

How long does planning permission take?

The Development Management Procedure Order gives the authority 8 weeks from the day after it receives an application for development that is not major, and 13 weeks for major development. The clock only starts once the application is valid, which is why the Lake District Authority's validation checklist matters.

How long does planning permission last?

Three years. Section 91 of the Town and Country Planning Act 1990 says the time limit for starting development in England is three years from the date permission is granted, unless the decision notice says otherwise. Start the work properly within that time or the permission lapses.

Do you need planning permission for a loft conversion?

Inside the Lake District National Park, yes if it changes the roof. The government's technical guidance says that in National Parks, the Broads, areas of outstanding natural beauty, conservation areas and World Heritage Sites, roof extensions are not permitted development and will require an application for planning permission. A conversion that keeps the roof as it is, with only rooflights, may be permitted development, so ask the duty planner.

This guide is a plain-English summary for homeowners, not legal or technical advice. Rules and prices change, so check the linked sources and ask a registered tradesperson about your own property.